40 HC Sanitary Container – Project for ATM Inwestycje

How do you turn a 40 HC shipping container into a fully equipped sanitary block? See how HARDBOX delivered 8 rooms, full installations and premium finishes for ATM Inwestycje.

A shipping container as a sanitary block – how we do it

Sanitary containers are one of the most practical applications of modular container architecture. For ATM Inwestycje Sp. z o.o. from Bielany Wrocławskie (near Wrocław, Poland), we designed and built a complete sanitary block based on a new 40 HC One Way shipping container – ready to connect and use within 10 weeks of signing the contract.

8 rooms in a single module

The main design challenge was making efficient use of the 12.2 × 2.4 m floor plan to fit eight independent rooms with different functions:

  • 3 shower cabins (3.78 m² each) – shower, compact toilet, washbasin
  • 2 toilet cubicles (2.5 m² each) – compact toilet, washbasin
  • 1 disabled-access toilet (3.78 m²) – wider 90 cm door, full fittings
  • 1 portable toilet washing station (1.6 m²) – SANBOX point
  • 1 dishwashing station (1.6 m²)

Each room has its own external entrance – anthracite technical doors with a porthole (40 mm), built for heavy use.

Finishes at permanent-building standard

Wet zones demand materials that stand up to moisture and cleaning agents. We chose solutions proven in public-use facilities:

  • Sintered stone Filo Argento / Filo Pece – on walls, moisture-resistant and easy to maintain
  • SINIAT CEMENTEX 10 mm board – wet-zone substrate instead of standard plasterboard
  • Commercial vinyl flooring on 100 mm XPS substrate
  • Closed-cell spray foam insulation – 20–60 mm on walls, 50 mm in ceiling

Installations – complete infrastructure in one module

The container is fully self-contained in terms of installations – it only needs an external water/sewage connection and power supply:

  • Plumbing: concealed alupex pipework, BOSCH 100L water heater, external water/sewage connection
  • Electrical: three-phase installation, 2×10 distribution board, IP65 sealed sockets, LED lighting with motion sensors
  • Mechanical ventilation: 500 m³/h unit, 8 diffusers – meets required air-change rates in all rooms
  • Heating: RedSnake infrared heater, 5.6 kW

Delivered in 10 weeks

From contract signing (19.02.2025) to a ready container – 10 weeks. This is possible thanks to prefabrication at our facility in Wrocław: all work – steel cutting and welding, installations, and finishing – is carried out under one roof, with no dependency on external construction crews.

If you need a sanitary solution for your project – construction site, market, recreational facility or public event – get in touch. We'll find the right module and room layout to match your requirements.